Job report 1 April 20th.

The job I performed was building a fence. The foreman was Brad from Habitat for Humanity,on Friday April 20th.

        We started by taking the fence boards from the front of the house to the backyard.They were cut in to two different widths. The boards were assembled in a pattern that went wide,skiny,wide,skiny.

 

We initially tacked the nails in so that we could make sure it was level before fully nailing the boards in. We checked if it was level after every two boards so it didn’t get off track.